The water to the building has been turned off, rendering it impossible to verify that 261.143 is being met. At the time of inspection, water was not available as required.
No training or drills were conducted in the fourth quarter of 2025 or the first and second quarter of 2026.
The facility was last inspected by a fire official on 12- 14-24, making the facility out of compliance by 1 year and 6 months.
On the day of inspection the generator failed to start.
The weekly and monthly tests [of emergency power equipment] have not been conducted since September of 2025.